Cason-scraper project

Cason-scraper project

Summary

in terms of manure treatment in the pig farm, the project adopts the urine bubble dung siphon discharge method to reduce the amount from the source, and needs to use cason flat type scraper for manure treatment

  • Jingpeng company in Inner Mongolia one million pig ecological recycling park project. Among them, in terms of manure treatment in the pig farm, the project adopts the urine bubble dung siphon discharge method to reduce the amount from the source, and needs to use our company flat type scraper for manure treatment.
  • The overall SUS304 structure of the equipment, the side plate with automatic adjustment function, the transfer plate with polyurethane, the pull rod ensures the solid strength, can scrape the urine and feces in the fecal ditch at the same time, effectively avoid the leakage problem caused by long-term accumulation of feces. The requirements for civil engineering are relatively loose, which reduces the difficulty of civil engineering construction and saves the civil engineering cost. Our company uses the domestic famous brand motor, using 10mm thick steel plate welding, the overall hot plating galvanized anti-corrosion treatment. The motor seat has the function of debugging Angle and height, and the site installation can be carried out for secondary debugging, so that the motor shaft gear and drive gear and chain combination to achieve the most ideal state. After signing the contract, our company will send professionals to the site for professional civil engineering guidance and the final site planning and survey, to ensure the smooth progress of the later delivery and installation.
  • The installation and 24-hour no-load test operation before the equipment leaves the factory can ensure that the equipment in the on-site installation, debugging and other work can run smoothly, with no abnormal situation. Our company is equipped with driving, forklift and other necessary loading and unloading tools, the operators have been formally trained and certified to work, to ensure that the equipment will not exist in any damage caused by human factors before leaving the factory. Effectively protect all the parts of the equipment before delivery to avoid the damage of all the equipment parts during the normal transportation process.
  • In this project, our company dispatched 4 professional installation staff to carry out a 20-day on-site installation, power connection and no-load debugging. After understanding the basic situation of the site, the installation was conducted according to the civil engineering situation and the site planning. Our installation personnel have been a Japanese generation of processing enterprise employees, excellent technology, high quality and high efficiency.
  • After the equipment debugging, our staff for the targeted training, ensure that each learners can operate equipment, and after the head of the Beijing peng company acceptance, we complete the site scraping equipment delivery, improve the resource utilization of livestock and poultry waste, achieve the combination, and the purpose of promoting the development of the surrounding planting industry. One year after the delivery, our company sent professionals to the site for the normal maintenance of the equipment, and guided and answered the operation of the site staff again.